Every payment claim, variation, inspection and document of your build in one place — with the dated paper trail to back you up when it matters.
Cancel any time · Set up in minutes · Ready before your slab is poured
The trades turn up and the house goes up. What goes wrong is everything around it — the money, the approvals, and the record of what was agreed and when.
None of this needs a lawyer. It needs a record — kept as you go, not reconstructed afterwards.
Nine things that together mean you always know where the money is, what's been agreed, and what you can prove. No tiers — every account gets all of it.



Every piece of construction software out there is built for the builder. It manages trades, schedules and margins, and it does that well — for them.
Nothing is built for the person whose savings are in the ground. The one who has to check a progress claim against a contract they signed nine months ago, remember which variation was approved verbally, and find the photo that proves the slab was poured in the rain.
That's what this is. Your timeline, your money, your evidence — kept in a form that holds up.
You're spending several hundred thousand dollars on this build. This will be the smallest line item in it — and one caught variation pays for the lot.
Cancel any time from your account — no minimum term, no lock-in.
You can, and most people start there. A spreadsheet won't hold the photo of the crack, the quote behind the variation, or the date you first raised it — and those are the three things you need when there's an argument. It also won't tell you your funds-to-complete position without you rebuilding the formula every month.
That's their record, kept for their purposes. Variations, progress claims and delay notices are exactly the points where your interests and theirs stop being the same. You want your own copy, with your own dates on it.
This is built for you too. Contract stages and progress payments are the core of it, and the budget section exists specifically for the costs a fixed-price contract doesn't cover — which is where most of the overrun happens.
Yes. Dollars, progress payment stages, bank drawdowns, defects liability periods, and a compliance checklist for whichever state or territory you're building in — all eight, with the right authority named for each.
Pay monthly for as long as you're building, or take the annual plan if you already know it'll be a long one. Cancel whenever you're done — there's no minimum term.
Straight answer: when a subscription ends, the files you uploaded — documents, plans, progress photos and receipts — are deleted from our servers. Your written records stay. Download anything you want to keep before you cancel, especially your photo record and contracts.
Right now it's one login per build, so you'd share it. Proper multi-user access is on the list.
Before the slab goes down, if you can. Setting up takes minutes at the start of a build and hours if you try to reconstruct six months of it from memory and a camera roll.
The best day to set this up is before the slab is poured. The second best is today.
Get started →Full access to everything · One plan · Cancel any time
Tell us where your build is up to and we'll tell you straight whether this helps. We reply to every message within 24 hours.